Free written estimates — site visit, line-by-line pricing, no obligation [TRACKING NUMBER GOES HERE]

Free on-site estimatesWritten, line-by-line pricing

[TRACKING NUMBER GOES HERE]

Concrete Driveways · Lee's Summit, MO

Concrete Driveway Replacement in Lee's Summit, MO

Lee's Summit's growth wave built fast — from 46,000 people in 1990 to over 107,000 today — and its lake subdivisions are deep into concrete age. The 1970s drives in Lakewood are on their second life; the 1990s–2000s pours across Raintree Lake, Winterset, and Chapel Ridge are hitting their first. We replace both, on a rebuilt base.

  • Free on-site estimates
  • Written, line-by-line pricing
  • Licensed & insured local crews
  • Tear-out & haul-off included

Get My Free Written Estimate

Serving Lee's Summit — tell us about the project and a local estimator will call you back to schedule the free site visit.

Serving all of Lee's Summit — Lakewood, Raintree Lake, Winterset, Chapel Ridge, and the Hwy 150 corridor. No spam, no obligation.

Driveway Replacement

Replacement Spec for Lee's Summit Clay

Lee's Summit sits on the same metro clay belt as the rest of the south metro: it swells in wet springs, shrinks in August drought, and cycles through 20-plus freeze-thaw swings a winter. Production driveways poured thin on minimal base in the 90s and 2000s are cracking at the joints and settling at the garage apron right on schedule.

Our replacement spec: full tear-out and haul-off, excavation of the failed base, compacted gravel, a 4-inch minimum air-entrained pour (5 inches where trucks, boats, or RVs park — common around the lake subdivisions), and control joints spaced to the slab. Most two-car replacements in Lee's Summit run $5,000 to $10,000 with tear-out included; larger lake-subdivision drives land in the low five figures. Full breakdown on our Kansas City driveway cost guide.

Lake neighborhoods & HOAs

Lakewood, Raintree Lake, and Winterset run architectural standards on visible exterior work. Mention your subdivision in the estimate request and the approval paperwork — dimensions, finish, color — goes into the job file at the first visit.

New pours along the growth corridors

Building or extending along Highway 150, 291, or the Pryor Road corridor? New driveways, third-car pads, and patio slabs formed and finished to match, tied into existing concrete with rebar.

The Pour Judgement Spec

What “Done Right” Actually Includes

Every replacement we quote is built on the same six line items — the difference between a slab that lasts decades and one that cracks in five winters.

Project Types

Concrete Work We Quote in Lee's Summit

The jobs homeowners in Lee's Summit ask us to price most — scoped on site and written up line by line, never sold off a script.

Lake-Subdivision Replacements

Full replacements in Lakewood, Raintree Lake, and Winterset — with the architectural-approval paperwork built into the job file at the first visit.

Two-Car Driveway Replacements

The standard Lee's Summit job: tear-out, rebuilt base, 4-inch minimum pour — 5 inches where boats and RVs park.

Third-Car Pads & New Pours

New driveways and extensions along the Highway 150, 291, and Pryor Road growth corridors, tied into existing concrete with rebar.

Patio Slabs

Backyard patios formed and finished to match, from broom finish to stamped.

How It Works

How Your Lee's Summit Project Runs, Start to Finish

Five steps, the same on every job — so you know exactly what happens at your home and when.

  1. Free site visit & written estimate

    We walk the project with you, check drainage and subgrade, and measure. You get a written, line-by-line estimate — tear-out, base, pour, finish, sealing — with no allowances and no obligation.

  2. Tear-out & haul-off

    The failed slab is broken out and hauled away the same day. Nothing gets buried on site and nothing gets poured over — the old problem leaves with the truck.

  3. Base rebuild

    The moved clay and broken subgrade that caused the failure are excavated, then rebuilt with compacted AB-3 gravel, graded so water runs away from the slab instead of under it.

  4. Pour & finish

    A 4-inch minimum air-entrained pour — 5 inches where trucks, boats, or RVs park — with control joints spaced to the slab and cut on time, finished broom, smooth, or stamped to your spec.

  5. Cure & care

    Walk on it in about 24 hours, park cars in about a week, full cure at 28 days. We leave you the care notes — including when to seal — so the new slab stays the way it was poured.

Local Knowledge

Neighborhoods We Serve in Lee's Summit

Lee's Summit grew from 46,000 people in 1990 to over 107,000 today, and its concrete aged in waves: Lakewood's 1970s drives are on their second life, while the 1990s–2000s pours across Raintree Lake, Winterset, and Chapel Ridge are hitting their first replacement now. Along Highway 150, 291, and Pryor Road, the work is new pours and extensions for a city still growing.

Common Questions

Lee's Summit Driveway Questions

How much does a driveway replacement cost in Lee's Summit?

Most two-car replacements in Lee's Summit run $5,000 to $10,000 with tear-out included; larger lake-subdivision drives land in the low five figures. Full breakdown on our Kansas City driveway cost guide.

Does my HOA need to approve the replacement?

Lakewood, Raintree Lake, and Winterset run architectural standards on visible exterior work. Mention your subdivision in the estimate request and the approval paperwork — dimensions, finish, color — goes into the job file at the first visit.

Why are the 90s–2000s driveways failing already?

Production driveways from that era were poured thin on minimal base. On Lee's Summit's clay — swelling in wet springs, shrinking in August drought, cycling through 20-plus freeze-thaw swings a winter — they crack at the joints and settle at the garage apron right on schedule.

How thick should the new pour be for a boat or RV?

Five inches where trucks, boats, or RVs park — common around the lake subdivisions — over the same compacted gravel base as every replacement we quote.

How long does a replacement take?

Most residential driveways pour in one to two days once the old slab is out. You can walk on the new concrete in about 24 hours, park cars on it in about a week, and it reaches full cure at 28 days.

Ready for a Lee's Summit driveway built on a real base?

Free site visit anywhere in Lee's Summit. Written price. No pressure.

Call for a Free Estimate Free Quote